Ready stockCummins 100 kVA
The workhorse — more of these run in Pakistan than anything else we sell.
- Phase
- 3-Ph
- Fuel
- Diesel
- Noise
- 72 dB
Karachi runs the country's largest industrial load on a grid that does not always keep up. We supply, install and commission Cummins, Perkins and Deutz sets in Karachi from our Lahore stock, with transport quoted openly and service coverage agreed in writing before you pay for anything.
Sea air is the difference. Salt and humidity attack canopy steel, terminals and radiator fins far faster than the dry heat of Punjab does, so the enclosure finish and where the set is placed matter more here than almost anywhere else in Pakistan.
Tell us how close the site is to the coast when you ask for a quote. It changes the canopy specification and the service schedule, and it is better decided at the start.
We do not have a showroom in Karachi, and we will not pretend otherwise. The set travels from Lahore by road, our team installs and commissions it under load on your site, and the quote shows transport as its own line based on distance and the rating of the set.
Ready stockThe workhorse — more of these run in Pakistan than anything else we sell.

Campus-scale power with a fuel bill a finance team will sign off.

Continuous duty for a process that is not allowed to pause.

Carries a full production floor, including everything starting at once.
A free site survey, an honest recommendation on rating, and an itemised quote with nothing buried in it. No obligation either way.
Mon – Sat, 9:00 AM – 8:00 PM